RapidAnnex Garden rooms & annexes

Self-build garden annexe kits — UK

The engineering is ours.
The build is yours.

A self-build garden annexe with the difficult part already finished. We set out the site, drive the ground screws and level the steel ring beam. You take it from there — on a foundation that is already dead level, already load-tested, and already signed off.

Who does what

  • Foundations We always do this
  • Shell We can, you can, or your builder can do this
  • Fit-out We can, you can, or your builder can do this
Cutaway view down into a furnished garden annexe, showing an open-plan living room and kitchen, a bedroom, and a separate shower room
Illustrative cutaway — layout and finishes are yours to specify

Where this sits

The permanence of conventional construction. The speed people associate with factory-built annexes. A price between the two.

Solid

A real building, not a frame with a skin.

Insulated formwork, reinforced and filled with concrete. Doors and windows are hung in a poured wall, not a panel. It is built to read as a small house, not a pod, a cabin or a garden room.

Fast

Built at the pace of a drop-in unit, without dropping the standard.

Ground screws go in without excavation and take load immediately — no dig, no muck away, no slab curing before you can start. The wall system goes up dry and is poured once, so the wet trades are few and short.

Sensibly priced

Between a bare self-build shell and a turnkey factory annex.

You are not paying a factory margin on every visible finish. Neither are you buying a pile of components with the difficult engineering left unresolved. The hard part is settled; the part you have opinions about is still yours.

Yours to finish

Specified by you, not by a production line.

You choose the kitchen, the bathroom, the cladding and the layout of the last 20%. Nobody hands you a fixed specification because it suits their production line. Spend where you want to spend, save where you want to save.

Finishes

The fit-out is yours to specify, not ours to supply. Try a few options on the model.

Cladding

Roof

Windows & doors

Floor

01 — We always do this

Foundations

The difficult part is already done.

  • Site set out
  • Ground screws installed
  • Steel ring beam levelled and set

02 — We can, you can, or your builder can do this

Shell

From level steel to weatherproof.

  • Build the Creo block walls
  • Concrete pour
  • Lay roof frame and insulated deck
  • Fit EPDM membrane
  • Install windows and doors

03 — We can, you can, or your builder can do this

Fit-out

Specify it how you want to live in it.

  • External cladding
  • Electrics
  • Plumbing and drainage
  • Heating
  • Kitchen
  • Bathroom
  • Decoration

How it works

Three stages. One handover.

  1. 01

    We always do this

    Foundations

    The difficult part is already done.

    • Site set out
    • Ground screws installed
    • Steel ring beam levelled and set
  2. 02

    We can, you can, or your builder can do this

    Shell

    From level steel to weatherproof.

    • Build the Creo block walls
    • Concrete pour
    • Lay roof frame and insulated deck
    • Fit EPDM membrane
    • Install windows and doors
  3. 03

    We can, you can, or your builder can do this

    Fit-out

    Specify it how you want to live in it.

    • External cladding
    • Electrics
    • Plumbing and drainage
    • Heating
    • Kitchen
    • Bathroom
    • Decoration

Drainage and utility routes need planning before anyone turns a screw. We will walk the site with you first.

On site

Not a visualisation.

A garden annexe first, photographed through its own build. The two sets after it are houses, not garden buildings — the same block and the same pour on a larger job, which is where most of our photography comes from. Every group says which it is.

Shell to first fix Garden annexe

One already built

A single-storey annexe at the end of a back garden: poured shell, roof deck on, battened out, first fix.

  • A single-storey annex shell standing at the end of a domestic back garden
    Shell up, at the end of the garden
  • The annex with roof complete and vertical timber battens fixed to the walls
    Battened out, ready to clad
  • Inside the annex, looking towards a rooflight, walls lined and roof insulated
    Rooflight in, roof insulated
  • Interior wall with first-fix electrical conduit run vertically before lining
    First fix, before lining

Foundations and steel House build

Set out and levelled

The perimeter goes down to the drawing before a single course is laid. Photographed on a house build — a garden job is the same sequence at a fraction of the size.

  • Insulated formwork blocks laid out as a level perimeter across a cleared plot
    Perimeter set out on the cleared plot
  • First course of formwork blocks running along a boundary fence
    First course, boundary side
  • A steel beam suspended from a crane above a completed wall line
    Steel landed onto the wall line
  • Two workers guiding a steel beam by hand as a crane lowers it into place
    Guided in by hand

The wall system House build

Formwork, then concrete

Dry-stacked and poured once. What sets is a solid reinforced wall. These are house walls — the same block and the same pour, on a bigger building.

  • Close-up of the moulded interlocking teeth on an insulated formwork block
    Interlock — the blocks key together dry
  • View along the hollow core of a formwork block showing the void the concrete fills
    The core the concrete fills
  • Two workers directing a concrete pump hose along the top of a formwork wall
    Pouring the wall
  • A completed poured wall shell with window and door openings formed
    Openings formed in the pour, not cut after

Sizes

Three footprints, drawn to scale.

One scale across all three, so the difference between them is the thing you are actually looking at. The internal layout is yours to settle with the drawings.

  1. Studio, home office, or a compact one-bed annexe.

    28

    £54,000 kit, inc VAT

  2. A comfortable one or two-bed annexe.

    35

    £72,000 kit, inc VAT

  3. A genuine two-bed annexe with room to breathe.

    45

    £90,000 kit, inc VAT

Kit prices include VAT and cover the shell as specified under what the kit includes. A fully managed build is priced separately.

Specification

What is in the kit, and what is not.

A shell built to a genuinely high standard. The finishing touches are yours to choose, not ours to impose.

Included in every kit

  • Ground screw foundation and precision steel ring beam — screws installed by our approved installer
  • Insulated beam and block floor system
  • Full ICF wall system, Building Regulations compliant
  • Windows and doors, fitted openings, precast lintels
  • Roof structure, insulation and EPDM weatherproof covering
  • Soffit, fascia and guttering
  • Internal partition walls and plasterboard, ready for your own finish
  • Full drawings, staged build sequence and wait periods
  • Video instruction library

Not included — yours to specify

  • External cladding or render
  • Electrics, plumbing and heating
  • Kitchen and bathroom
  • Decoration
  • Drainage and utilities connections

Drainage and utilities connections are genuinely site-specific and are quoted separately once your site has been assessed.

Wall system
BBA Agrément 21/5850, NHBC and LABC accredited
Components
One principal block and one end closure piece — a deliberately small range, so there is less to learn on site and less to get wrong.

Pricing

Two routes. The same foundation under both.

Every price on this page includes VAT. We install the ground screws and the steel ring beam either way — the difference is who takes it from there.

Route one

Self-build kit

Everything you need to build a permanent, fully compliant structure yourself, or with your own trusted builder.

Route two

Fully managed build

Do not want to build it yourself, and do not have a builder of your own? Solvere, our sister company, will build and manage the whole thing — professionally installed, start to finish.

28 days target programme, typically faster

Kit and fully managed build prices by annexe size, including VAT
Size Self-build kit Managed build by Solvere
28 Studio, home office, or a compact one-bed annexe. £54,000 Price on application
35 A comfortable one or two-bed annexe. £72,000 Price on application
45 A genuine two-bed annexe with room to breathe. £90,000 £129,995

All prices include VAT. Managed builds are carried out by Solvere, our sister company. Drainage, utilities and heating are quoted separately once your site has been assessed.

On any size

Staged delivery +£5,000

Materials arrive matched to your build sequence rather than all at once, so you are not storing a whole annexe in the garden from day one.

Optional extras

  • Ground and lawn protection £850 – £950 Trackway and sheeting for the duration of the build.
  • Underfloor heating upgrade from £4,300 Approximately £4,300 – £4,500 installed.

Speed record scheme

Build it faster than anyone has, and we will pay you for it.

Self-build kits only — Solvere-managed builds are not eligible.

  • £1,000

    Cashback for any self-build unit completed within 21 days, evidenced.

  • £1,000

    Monthly recognition for the fastest verified build each calendar month.

  • £5,000

    For an outright new national record.

Before you start

An annex someone lives in needs planning permission.

Outbuildings can often go up under permitted development. A self-contained annex — its own bedroom, kitchen and bathroom — cannot. It needs full planning permission, building control sign-off, and it may change your council tax banding.

That is not a reason to walk away. It is a reason to get it right first. We supply the drawings and the technical pack your application needs.

Planning, building control, drainage, cost and warranty — sixteen questions answered

Enquiries

Tell us about the garden.

Email is the quickest way to reach us, and it means you can attach photographs of the spot — which is the first thing we would ask for.

info@rapidannex.com

Or call 020 3422 1262

Every job starts the same way: we walk the site with you before anyone turns a screw.

What to put in it

  • Roughly where in the garden it would go
  • The space you have for it, even approximately
  • How a steel beam would reach it — side access, driveway width, overhead cables
  • What it is for, and who would be using it